Mooring Material Cost Estimation for a Floating Photovoltaic Farm

Article Open Access

Mooring Material Cost Estimation for a Floating Photovoltaic Farm

Author Information
Centre for Marine Technology and Ocean Engineering (CENTEC), Instituto Superior Tecnico, Universidade de Lisboa, 1049-001 Lisbon, Portugal
*
Authors to whom correspondence should be addressed.

Received: 30 September 2026 Revised: 28 October 2026 Accepted: 03 November 2026 Published: 25 November 2026

Creative Commons

© 2026 The authors. This is an open access article under the Creative Commons Attribution 4.0 International License (https://creativecommons.org/licenses/by/4.0/).

Views:30
Downloads:11
Mar. Energy Res. 2026, 3(4), 10025; DOI: 10.70322/mer.2026.10025
ABSTRACT: This study presents mooring material cost estimates for two floating photovoltaic concepts developed in NATURSEA-PV at different potential sites. Based on the quasi-static mooring model and the three-component chain–polyester–chain configuration developed in the previous study, a cost-based optimisation is performed for selected sites in the Algarve, Canary Islands and Adriatic Sea. The total mooring line length, polyester length and initial pretension are optimised while satisfying the prescribed requirements for maximum mooring tension, platform offset and seabed contact. The estimated cost includes the chain, polyester rope and anchors, with the anchor cost determined according to the anchor force. The optimisation is performed for two substructure designs, and the resulting costs are compared at both unit and farm levels. The results show that water depth and the associated mooring line length are the main factors governing the material cost, while differences in environmental conditions mainly influence the tension utilisation and platform offset. The two designs generally result in comparable mooring costs per floating unit. However, Design 2, with a larger span between the floaters, requires fewer floating units at farm level and therefore results in approximately 40.5–49.4% lower total mooring cost than Design 1 for the comparable sites considered.
Keywords: Offshore floating photovoltaic system; Mooring analysis; Cost evaluation; Optimization